ZKX's LAB

溢洪道控制段有什么用? 溢洪道控制段水流流速

2020-07-26知识14

为避免溢洪道在高速水流作用下产生空蚀破坏,当流速超过()m/s时,应设置掺气减蚀设施。 A.25 B.30 C.35 C何谓正槽式溢洪道,由哪几部分组成,适宜怎样的地形条件? 过堰水流方向与泄槽轴线方向一致的开敞式溢洪道。开敞式溢洪道通常主要是指正槽式溢洪道由进水渠、控制端、泄槽、消能工和泄水渠组成。道口下沿与所设水标离平,道落差率大于0.3;条件:落差坡度为0.25—0.35间,岸边有高程适宜的马鞍形垭口。英语翻译 The control of spillway often set contraction in paragraph after paragraph,and the spillway flow is generally rapids,therefore,will have a steep contraction in paragraph shock waves,so that flow pattern inside the spillway complex.Flow characteristics of the convergent section should be used shock wave theory,analysis and calculation,only the normal hydraulic chute segment can be calculated using the energy equation.Analysis shows that,due to contraction in the normal chute segment and the relative level of different segments,will produce different forms of surface convergence.In most cases,the steep contraction segment control of the spillway chute shock wave over-current capability and side-wall height.某山区水库库容12.8×108m3,在拦河坝左侧较远处设置溢洪道宣泄洪水,溢洪道由进水渠、控制段、泄槽段、挑流鼻坎 B简述溢洪道设计过程 设计溢洪道设计中把握的基本资料是否充分与完善,选用的设计标准是否恰当,均直接影响到整个工程的安全及经济,现就有关问题谈一些看法:1.规划布局溢洪道工程的规划布局应尽量利用有利地形地貌,即要经济合理又要保证安全。如大坝四周有天然山坳可以布设溢洪道则最为理想,如主坝口子狭窄无法布置正堰则可考虑选择侧槽式溢洪道。其规划布置的主要原则是:基础坚硬均一,线路短,无弯道,出口远离坝体;工程严禁布置在滑坡或崩塌体地上。溢洪道通常有四个主要部分组成:引流段、控制段、泄流段及消能工。2.引流段为引流平顺其进口外形最好做成喇叭口,为减小损失其长度不宜过长。如因地形所限必须在该段内设置弯道时,则应e799bee5baa6e997aee7ad94e58685e5aeb931333363366232使弯曲段尽量平缓外、还应使弯道与下游衔接段和出口段尽量远离坝脚,以免冲刷坝脚。引流段截面一般选用梯形或矩形,当流速≤1~2米/秒时一般可不砌护,但与坝端邻近和紧接控制建筑物的范围内应砌护一定长度,同时在弯道二侧的凹岸亦应砌护,如为坚硬的岩基则可不考虑。3.控制段为使泄流均匀,可使近口水流垂直于控制段建筑物;根据地形条件和泄流需要必需设置宽顶堰或实用断面堰,堰宽度。溢洪道控制段有什么用? 溢洪道底板一般为水库正常蓄水位,控制段边墙高度以校核水位加安全超高,控制段形成堰流。

随机阅读

qrcode
访问手机版